Inspecting waterproofing: what certifiers should look for

Last updated · By CertifiersCPD editorial team

Waterproofing failures are among the costliest defects. Here is what to look for before tiles cover the evidence.

Short answer: check falls to drains, membrane coverage and upturns, details at penetrations and junctions, and collect evidence before the membrane is covered. Once tiled, problems are hard to see and costly to fix.

Key checks

ItemWhat to look for
FallsWater drains to the outlet with no ponding
Membrane coverageCorrect areas, continuous, no damage
UpturnsAt walls, doorways and hobs as required
PenetrationsTaps, pipes and drains properly sealed
JunctionsFloor to wall, changes of material
BalconiesThresholds and drainage to the outside

Evidence to request

  1. Product and system details.
  2. Installer's certificate, where your state requires it.
  3. Dated photos of preparation, membrane and flood testing where done.

Common defects

  • Missing or low upturns at doorways.
  • Poor sealing around floor wastes.
  • Membranes damaged by other trades before tiling.

Record it

Note what you saw, what you could not see and any directions given.

Keep learning

Waterproofing standards and products change. It is a valuable CPD topic for certifiers and inspectors.

General information only. Check the NCC and your state's inspection rules.

Frequently asked questions

When should waterproofing be inspected?

Before it is covered by tiles or other finishes, where your state requires or allows an inspection at that stage.

What evidence should I ask for?

Product details, the installer's certificate where required, and dated photos of each stage.

Related